LCRA 161kV Transmission Line Rebuild Project

Location: Texas

Description: Construction included the rebuild of approximately 14 miles of energized 161kV transmission line in Houston, TX. Existing H-frame structures were replaced with new structures, and new switches were installed in an existing substation.

Completion Date: 2015

Work Performed By: High Country Line Construction, Inc., a subsidiary of MYR Group

Client: Irby Construction Company