Print Friendly, PDF & Email

Project Detail

Sloan Canyon Switchyard & Transmission Line

   

The Sloan Canyon Switchyard and Transmission Line project consists of 72-miles of optical ground wire between Pahrump and Boulder City, Nevada. The 18-month Sloan Canyon transmission improvement project includes a switching station and a 3.2 mile 230kv transmission line. High Country Line Construction’s (HCLC) scope includes civil work, foundations, switchyard electrical, overhead and underground fiber optic and transmission line construction utilizing helicopters.

Completion Date: 2019

Client: Gridliance