Spinning Spur III Windfarm 345kV Transmission Line

Location: Texas

Description: This project consisted of the construction of approximately nine miles of 345kV transmission line, utilizing 795 Drake bundled conductor, which connects to the 194-megawatt (MW) Spinning Spur III Wind Farm. The farm is comprised of 97 2MW wind turbines as well as a 34.5kV underground collection system. The project also included installation of drilled pier foundations and direct embed concrete backfill poles.

Completion Date: 2015

Work Performed By: High Country Line Construction, Inc., a subsidiary of MYR Group

Client: EPC Services Company