Print Friendly, PDF & Email

Project Detail

Springbok Solar 230kV Transmission Line

Location: California

Description: Construction included two miles of new, 230kV transmission line, steel monopoles on concrete piers (upwards of 8drilled shafts), and single circuit (795 AAC) and double circuit (1590 AAC) wiring. The new transmission line connects to the 137 megawatt (MW) Springbok Solar project. Environmental preservation methods were utilized to avoid disruption to local desert tortoise and kit fox habitats.

Completion Date: 2016

Work Performed By: High Country Line Construction, Inc., a subsidiary of MYR Group

Client: EPC Services Company