GREAT WESTERN WIND 345KV TRANSMISSION LINE Clean Energy
GREAT WESTERN WIND 345KV TRANSMISSION LINE |
|
|---|---|
| Client | EDF Renewable Energy |
| Completion Date | 2019 |
| Location | Oklahoma |
High Country crews installed 22 miles of 345kV single circuit bundled 795 ACSR drake on steel monopole structures connected to the 225-MW Great Western Wind Farm, which is comprised of 30 3.3MW and 51 2.2MW wind turbines. The project also included ROW clearing and foundation installations that ranged between 8 and 12 feet in diameter.