GREAT WESTERN WIND 345KV TRANSMISSION LINE Clean Energy

GREAT WESTERN WIND 345KV TRANSMISSION LINE

Client EDF Renewable Energy 
Completion Date 2019
Location Oklahoma

High Country crews installed 22 miles of 345kV single circuit bundled 795 ACSR drake on steel monopole structures connected to the 225-MW Great Western Wind Farm, which is comprised of 30 3.3MW and 51 2.2MW wind turbines. The project also included ROW clearing and foundation installations that ranged between 8 and 12 feet in diameter.